Caterpillar Excavator Swing Gearbox in San Diego - With one of the greatest selections in the business, you can be sure to uncover the parts you might need to get you back to work quickly. Our expert San Diego group of parts professionals are prepared to help you find the parts you're after.
There is a great convenience when utilizing a scissor lift, since the convenience of working and the lift basket's safety gives peace of mind while trying to carry out tasks that could have otherwise required utilizing the step of a ladder. The safety risks involved with this machine make it the right option for performing jobs from heights.
The majority of scissor lifts are powered electrically by batteries which have been mounted directly onto the machinery. These batteries would need to be charged following a long shift or after sitting for extended periods without use. It is an easy job to charge the batteries. This can be done without any particular tools or equipment and needs no heavy labor.
So as to prepare the scissor lift for charging, park the machinery next to an electrical outlet. Make sure you are doing this in a well-ventilated place. Then, so as to avoid another operator from driving away with the lift plugged in, press the emergency shut-off switch. The emergency shut off switch is the large red button found in the basket of the lift, near the control box or the charger. Find the battery charger on the right side of the base of the lift. Often, models that are older would have the charger mounted on the rear of the lift.
The AC extension cord should next be plugged into the charger. Be certain to charge in a well ventilated place and plug the cord into an electrical outlet. So as to avoid accidental damage from being run over, the length of the electrical cord on the battery charger is intentionally short. This is because if any extra length were to drop out of the battery charger storage area when in use, extreme danger can potentially take place.
Some of the most remarkable structures throughout the world are made using cranes. The newer cranes are designed in order to reach higher heights. Tower cranes offer the way to move and lift materials, tools and building parts around a construction location. There are various parts which assemble a tower crane when they are put together. Putting a tower crane together uses various pieces of construction equipment.
Base
Typically, the base of a tower crane is made from a steel unit. The base is attached to a custom-designed concrete pad. This set-up provides the structure with stability. Overall, the construction must be engineered and built well in order to operate at optimum safety.
Mast
The tower cranes mast provides height to the equipment. The mast is made of attached steel parts. The amount of sections determines the height of the crane. Usually, a tower crane has a design that enables the mast to grow during construction by adding further parts as the building process goes on. This way the crane's height can be specified, ensuring it has adequate height to efficiently and safely carry out the needed work.
Slewing Unit/Top Climber
A slewing unit is situated above the mast. This unit houses the equipment and the motor that enables the crane to rotate. A top climber is the piece of machinery that allows the mast to grow. The top climber sits just underneath the slewing unit. Hydraulic rams in the top climber allow the slewing unit to be disconnected from the mast by raising it higher.
Boom
The term "boom", refers to the tower crane's working arm. The boom is made up of separate steel parts that are attached together, extending out from the top of the slewing unit and parallel to the ground. There is a trolley attached to the underside that could run the length of the boom. This particular trolley has the hoisting device.